Please note that the ITEA Office will be closed from 25 December 2024 to 1 January 2025 inclusive.
Muwo
Multi-method workspace for highly scalable production lines
Project description
Muwo aims to create an opportunity to use production systems more effectively through flexible scaling. Scalability is achieved by the development of smart hardware interfaces. This will allow workstations to advance to multi-method workstations that support both manual and automated processes. Additionally, workstations can combine different processes. A transmutable simulation validates the workstation configuration and a process combiner optimises the production configuration using AI/ML methods. Through this, Muwo improves the design and operation of production systems.
Portugal
SISTRADE Software Consulting, S.A.
Portugal
Spain
Accuro Technology S.l
Spain
Türkiye
Project publications
- Muwo Project profile leaflet Project Leaflet 30 May 2022 Download
Work package documents
- D4.1 - General approach to describe processes.pdf Work package document 13 June 2022
- D4.2 - Methods to arrange the production means and components.pdf Work package document 29 July 2022
- D5.1 - Open data interface for ERP MES integration.pdf Work package document 28 November 2023
- D5.3 - Mathematical model for factory layout and production systems balancing.pdf Work package document 03 February 2023
- D5.4 - Integrated mathematical model for scheduling and rebalancingreconfiguring the production systems.pdf Work package document 29 November 2023
- D6.1. List interface and connected equipment in the production area_finalV_2.pdf Work package document 01 February 2022
- D7.2 - Dissemination plan and report (initial version).pdf Work package document 05 August 2022