BE Faster
Building Energy Flexibility at Scale for Trading and Earning of Revenues
Project description
BE Faster brings countries closer to Net Zero by creating a scalable flexibility trading platform enabling a smarter use of data and controls to reduce energy wastage and support grid supply-demand balancing. The solution defines the Net-Zero pathway for organisations by looking at carbon grid intensity as a signal for trading. BE Faster provides novel algorithms for trading based on several parameters identified using digital twins. The ecosystem will be accessible using open-source code and templates and standards developed will be used to roll out the solution to partner countries.
South Africa
BRAVE Digital
South Africa
United Kingdom
Consortio Limited
United Kingdom
Energy Systems Catapult
United Kingdom
Integrated Environmental Solution Ltd (IES)
United Kingdom
Project publications
- BE Faster Project profile leaflet Project Leaflet 01 April 2025 Download
Work package documents
- D3.2 Connection for Open Communities - Engineer Manual Rev1.0.pdf Work package deliverable document 04 March 2026
- D7.1 ESC01019 BEFaSTER_Market Segments_Channel Partners_V1_20251026.pdf Work package deliverable document 04 March 2026
- D7.5 One of the two exhibitions.pdf Work package deliverable document 04 March 2026
- M&V Guidelines draft 11 feb 2026.pdf Work package deliverable document 04 March 2026